AI Data Centers Set to Consume 20% of US Power Grid by 2035 — What the 118 GW Surge Means
AI data centers are projected to consume 20% of US grid capacity by 2035, with BloombergNEF warning of a 118 GW surge ahead. BloombergNEF analysis and DOE reference data confirm the projection.